Project Name: WSSU Privatized Student Housing
Location: Winston-Salem, NC
Description: Phase One – Gleason Hairston Terrace
• 123,000 sq. ft.
• 400+ beds
• Electrical rough-in trim out of the building in just 120 days to meet student move in date.
Description: Phase Two – Foundation Heights
• 114,000 sq. ft.
• 330+ beds
• Electrical rough-in to trim out of the building in just 100 days to meet student move in date.
• Concrete encased ductbank for telecommunications system from Anderson Hall to Foundation Heights. This included boring under MLK Blvd. and running fiber optic cabling.
• Provided a 45kva natural gas generator.